Extraordinary meeting

Friday, 12 October 2007
Source

Business papers


Agenda

Item no. Page no. Subject Comments
    PRAYER/REFLECTION
(and Recognition of the Traditional Owners, theDarug and Gundungurra People)
 
    APOLOGIES  
    DECLARATIONS OF INTEREST  
    OFFICERS' REPORTS  
    USING LAND FOR LIVING  
1 9 Public exhibition of the Options Report for the Springwood Town Centre Project
Attachment: Springwood Town Centre Project - Public Submissions Summary
 

See also: Information about the council meeting - includes guidelines for speakers

See also: Information about development applications


Officers reports

Item no: 1

Subject: Public exhibition of the options report for the Springwood Town Centre Project

FILE NO: F03147, F00241

Item 1: Springwood Town Centre Project

Recommendations:

  1. That the Council accept and note the submissions received.
  2. That the Council receive a report presenting the documentation and process to be followed for the Call for Expressions of Interest (EoI) on three specific Council owned or managed sites within Springwood Town Centre being the Northern Car Park, the Southern Car Park and the Civic Centre Sites. That opportunities and suggestions outlined in the Options Report are amended in the EoI documentation as detailed in this report.
  3. That where practical the criteria used for assessment of the EoI recognise the issues raised by the public submissions including, but not limited to:
    1. Relevant previous experience;
    2. Financial capacity;
    3. Conformance with LEP 2005;
    4. Net community benefit of the Initial Proposal;
    5. Attention to triple bottom line outcomes.
  4. That consideration be given in the preparation of the 4 year Management Plan 2008-2012 for resources to undertake a review of strategic plans relating to Springwood Town Centre Master Plan; Springwood Town Centre Parking; and for the preparation of a city wide parking strategy.

Report by Group Manager, Community and Corporate

Report summary

The purpose of this report is to present to the Council the results and analysis of submissions made on the public exhibition of the "Springwood Town Centre Options Report" (Options Report).

The Options Report presents a preferred option, selected from a range of six options, for the Council to seek expressions of interest from the private sector to redevelop one or more of three public owned sites within Springwood Town Centre. The Options Report outlines the background to the project and key issues surrounding the operation of Springwood Town Centre. It also sets out a planning framework for the project, including a draft Vision; economic, social and environmental outcomes. An overview of Community facilities and parking issues is provided, and a number of supporting studies are summarised in the Appendices. Option 2 is the preferred option determined by the Council and proposes that the Civic Centre and the Northern and Southern Car Parks (together) are offered to the market accompanied by Council identified opportunities and suggestions.

The Options Report was placed on public exhibition from 13 August to Friday 21 September, 2007 and submissions were received up to 9am Monday 24 September. Overall 145 submissions were received during this period. Comments presented ranged from full support to part support or opposition to some or all of the options and concepts presented in the Options Report. A large number of comments were received on a range of issues. These are summarised in this report and a number of amendments to the EoI documentation and process are proposed in response to the submissions received.

An electronic copy of all submissions has previously been supplied to the Councillors for their information. A copy of all submissions has also been made available for public viewing at the Council offices and public libraries, and an electronic copy is available for viewing on a Springwood Project page on the Council website. The copy of submissions made available to the public has been amended to remove personal information regarding the submitters.

Background

The "Springwood Town Centre Options Report" as placed on public exhibition presents a broad range of options for proceeding to an open EoI process for the potential redevelopment of public land located at three sites within Springwood Town Centre. The EoI process needs to conform to applicable legislation and policy and is proposed to be undertaken within the requirements of the Tendering Policy of the Council.

The "Springwood Town Centre Options Report" was presented to the Council at its meeting of 7 August 2007. The Council resolved:

  1. That the Council adopts the Options Report being Enclosure 1 to this Report for the purpose of public exhibition.
  2. That the Council endorse the public exhibition of the Options Report for six (6) weeks commencing Monday 13 August 2007 until Friday 21 September 2007, with submissions on the Options Report accepted until 9am on Monday 24 September 2007.
  3. That a summary sheet of the report be made available due to the extensive content of the Options Report.
  4. That both a public forum and public information day be held.
  5. That the Council seek to develop a Memorandum of Understanding with the Department of Lands regarding their participation in the Springwood Town Centre Project.
  6. That the Council delegate to the General Manager the authority to sign a Memorandum of Understanding with the Department of Lands regarding their participation in the Springwood Town Centre Project.

(Minute No. 210, 07/08/2007)

External consultation

The Options Report was placed on public exhibition for a period of six (6) weeks. Copies of the Options Report were placed on display at Council offices in Katoomba and Springwood and in Council Libraries across the city. It was also made available for viewing and download from the Council website. Printed copies of the Options Report and a summary document were distributed on request from the Council offices in Katoomba and Springwood.

On Saturday 25 August 2007 a public information session and a public forum were conducted at Springwood Bowling Club. Approximately 50 to 60 people attended each session. A broad transcript of the public forum was made available on the Council website for the information of the public during the remainder of the public exhibition period.

Written submissions were requested on the Options Report. One hundred and forty five (145) submissions were lodged with the Council by Monday 24 September 2007. These submissions have been analysed and a summary of the issues contained in the submissions is presented in this report.

One submission was received from Sydney West Area Health Service, and nine (9) submissions were received from community organisations being:

One hundred and nine (109) submissions were received from Springwood district from local residents and/ or business operators. The location of submitters is summarised in table 1 below. Map 1 shows the location of the five geographic catchment or planning areas within the City: Areas 1 to 5.

Table 1: Locations of submitters

Submitter Location (Planning Area) Number of Submissions
Area 1 0  
Area 2 5
Area 3 11
Area 4 Faulconbridge 109 19
Winmalee 11
Springwood 75
Valley Heights 4
Area 5 8  
Outside of City /unknown location 12
Total 145

109

Map 1: The Five Geographic Catchment or Planning Areas of the City of Blue Mountains

Issues raised

A summary table of the issues raised and numbers in support or otherwise is provided as Attachment 1. The main issues raised are outlined below.

Although not stated as succinctly, the majority of submissions appear to support Option 5 of the Options Report: i.e. that no sites are offered to the market. While acknowledging this sentiment this report continues to support the proposed Option 2 as this is consistent with the Council's adopted position and it provides the Council with the opportunity to test the market. Consequently this report presents suggested amendments to the Call for Expressions of Interest process or documentation in response to the issues raised in the submissions.

The major issue raised by the submissions related to the introduction of a multinational supermarket and/or major chain stores and shopping mall to Springwood. Concerns surrounded the perceived impact of this style of development on the existing village atmosphere and on the viability of the local traders currently operating in the village.

A majority of submissions did not support the inclusion of one or more of the site options. Concern was also expressed around the sale or lease of public land for the purpose of increased commercial or retail development within the town centre. Comments related especially to the loss of public control and access to the land and existing facilities.

A number of submissions commented on the planning process used and the EoI process especially related to the timetable and the extent of community consultation undertaken.

Many submissions commented on various aspects of the provision or upgrade of community amenities and facilities. Thirty two submissions supported refurbishment of community facilities and a number argued that as this would be more affordable than provision of new facilities and subsequently could make the sale or lease of public land unnecessary. Many submissions opposed relocation of the Early Childhood Centre and/or children's playground from the Northern Car Park or to Buckland Park. In particular the various community organisations that use the War Memorial in Buckland Park during the year were opposed to relocation of the Early Childhood Centre to the park as it may interfere with the capacity of the Memorial on ceremonial occasions. The Western Sydney Area Health Service made comments as to the considerations necessary for any relocation of the facility and nominated preferred locations. Retention or enlargement of the Town Square was proposed in many submissions.

Retention of safe and accessible at-level parking, public toilets and open space in the centre of the town centre were major issues raised. The importance of retaining views to the bushland from the Town Square and adjoining public areas was also raised in a number of submissions.

Table 2 below lists the various matters and issues raised. Responses to the issues raised are provided in Table 2 and amendments to the EoI documentation or process are recommended.

Although not specifically stated by many, the submissions supported the social, environmental and economic outcomes stated in the Options Report. However many opposed specific suggestions and opportunities for the different sites as detailed within the Options Report. Amendments to these are proposed in Table 2.

A review of the parking requirements within Springwood Town Centre and an update of the Springwood Town Centre Master Plan were also suggested by a number of submissions. This report makes recommendations that the Council consider allocation of resources to undertake this work.

Analysis and responses to issues raised in submissions

Table 2 provides a summary of key issues raised in submissions, responses to these issues, and recommends amendments to the Call for Expressions of Interest.

Table 2: Key issues

Issue raised in submissions Response Recommended amendments to the call for expressions of interest

1. Planning Framework

There is already a "Vision" statement in the newly gazetted LEP 2005. LEP 2005 was generated after a significant amount of community consultation. What is wrong with that Vision statement and why does it need to be changed? It would appear that the Vision has been created because the LEP does not support the process the Council is now undertaking.

A Vision statement for the project was developed in response to requests made at the stakeholder workshop in March 2007. The Options Report complies with LEP 2005 and the wording echoes the LEP2005.

E.g.:

Objectives of the Village-Town Centre zone include:

"To promote economic viability of the towns and villages.

"To focus large scale retailing and other higher order uses in appropriate locations within the district centres of Katoomba and Springwood. " The precinct statement in LEP 2005 outlines in detail the considerations and precinct character with which new development must comply.

The Vision statement is maintained to guide EoI

2. Consultation and opportunity for public comment

The project should use consultation techniques designed to include people of all ages, backgrounds and education levels This is noted. The timetable of the project did not permit extensive community consultation. No change
There was inadequate notification of the consultation process and inadequate levels of consultation Normal Council practices were used to publicise the opportunities for consultation which were the public forum and the exhibition of the Options Report within the time frame of the project. No change

3. Expressions of Interest process

Request/ demand opportunity to comment on specific proposal during EoI assessment process The proposed EoI assessment process follows the Council Tendering Policy. This has strict requirements for confidentiality.

There may be the opportunity for the Council to consult with the community on specific issues or components of proposals between stages 1 and 2 of the EoI process if considered appropriate.

No change
Time for EoI submission is inadequate for proponents to compile adequate proposals: request that this be extended to late March 2008 The process proposed is a 2 stage process: this is to allow time for a general proposal to be prepared within the 6 week advertising period of stage 1 and then, subject to invitation to participate in the second stage of the project, for preparation of a more detailed proposal over a longer time period. No change

4. Supporting research

Requests were received for copies of supporting reports such as the "Springwood Town Centre Economic Advice- Stage 1: Market Assessment and Identification of Uses". By HillPDA; and "Springwood Town Centre Revitalisation Stage 2 Traffic and Transport Advice" by GHD. Copies of reports were made available on request during the exhibition period. Copies will also be made available to accompany the EoI. No change
Components of the Economic report were questioned. E.g. the estimated retail escape expenditure HillPDA Report was commissioned to examine strategic implications of redevelopment within the Springwood Town Centre (Study Area). The report is considered to be adequate for the purposes of the project. No change
Preparation of a social needs and cultural assessment is essential before Council proceeds with this project An initial report on community facilities and services informed the Options Report. However this did not provide details of future requirements for community facilities and services. It is proposed to undertake a Comprehensive Social and Cultural Assessment to support Springwood Town Centre Project by March 2008. This report would then inform stage 2 of the EoI process. No change to Stage 1 EoI. That a comprehensive social and cultural assessment report is undertaken by March 2008 and that this informs Stage 2 of the EoI.

5. Civic Centre Site Option

Don't redevelop parking areas as there is not enough parking for special events as it is. See parking matters below No change
Request retention or replacement of community facilities on site Options Report already suggests "Retain, enhance or replace existing community buildings and services" No change
Ensure that Council maintains control of these facilities: we do not want private developers charging for use of the Civic Centre or library services The Council already charges for use of public halls on a sliding rate which offers community group concessions.

Regarding library access, NSW Legislation requires that "any person who is a resident of the area of the local authority or a ratepayer of the local authority is entitled to free membership of the Library free of charge." And that "Any person (whether or not a member of the library) is entitled free of charge to access to any book of the library and to any information forming part of the information service of the library (other than information excepted from free access by guidelines issued by the Council) for use on the library premises."

No change
Suggestions were given regarding shifting of certain facilities to other sites e.g. Library and Neighbourhood Centre with a new Tourism Information office on the Northern or Southern Car Park. The Options Report does allow and encourage lateral solutions to relocation of facilities provided that they meet community needs and demonstrate public benefit. No change
Support decked parking and support for residential development. The opportunity exists for this to be included in a proposal for the EoI No change
Support for extending the existing supermarket The opportunity exists for this to be included in a proposal for the EoI should the owners or operators of the existing supermarkets wish to expand No change
Suggestions for various changes to traffic circulation The Options report does recognise that consideration of traffic circulation changes may be of advantage No change
Do not relocate pedestrian crossing as this would cause traffic problems The GHD report states that the pedestrian desire lines coincide with the location of the existing crossing and suggests that were the pedestrian crossing to move that an additional pedestrian crossing would be required across the wide intersection of Greenway Lane. Remove reference to relocation of pedestrian crossing in the EoI
Use the same developer for the Civic centre site as the other sites Subject to appropriate proposals being received this is permitted within the EoI. No change
Consider relocation of Early Childhood Centre to the Civic Centre site not Buckland Park Valid concerns have been highlighted about relocation to Buckland Park Amend the EoI to suggest consideration incorporation of Early Childhood Centre in future development on the Civic Centre site, the Northern Car Park or Southern Car Park

6. Southern Car Park

Comments on the concepts for this site are included elsewhere in this table See responses elsewhere within the table See elsewhere within the table

7. Northern Car Park

Comments on the concepts for this site are included elsewhere in this table See responses elsewhere within the table See elsewhere within the table

8. Traffic

Congestion of Hawkesbury Road roundabout at peak afternoon times is a problem and this would reduce potential for any increase in trade. This was noted in the Options Report. There needs to be a whole of government approach taken to resolve current traffic congestion issues. The Options Report recommends that the Council continues to lobby the RTA on this matter. No change
Further development will result in increased traffic and congestion within the town centre. Council's consultant has advised that new retail uses would function along side existing retail provision and that most trips are already occurring. Peak traffic generation periods for retail would be the weekday evenings and Saturday lunch time. No change
Semi trailer traffic would increase with additional supermarket and shops and this needs to be considered. The EoI is a staged process and the detailed proposals would be required to identify potential traffic impact and how it will be addressed. Traffic considerations would also be considered during development assessment prior to any actual development. Traffic assessment should be required as part of stage 2 of the EoI
The Town Square pedestrian crossing should be converted to traffic lights This is noted. The impact of any proposal on pedestrian needs would also need to be assessed with any detailed proposal. Traffic assessment should be required as part of stage 2 of the EoI
Macquarie Road and Greenway Lane should be made one way roads. This suggestion is noted for consideration within any future traffic assessment. However the recent GHD report on traffic does not indicate the need for major changes such as this.. No change
For whole of Area 4 - install more footpaths, Highway crossings, local traffic calming measures. This is noted but is outside the study area and the scope of the project. The request will be conveyed to Council's traffic section for consideration. No change

9. Parking

Loss of any public parking is unacceptable. As mentioned in the Options Report, any parking removed must be replaced. No change
The existing at-level parking in the Northern Car Park is most desirable and heavily used. Do not remove it. The point is acknowledged however the Options Report does indicate that although parking must be replaced consideration could be given for relocation from the Northern car park to the Southern car park. It will have to be developed in accordance with current standards required under the Better Living DCP. No change to stage 1. Stage 2 should require provision of detail on any proposal for public parking.
Decked parking - visual appearance LEP 2005 controls the building appearance, and these matters will be considered within the EoI assessment process. No change
Underground parking - visibility, security, accessibility, replacement of
parking lost, paid parking
Control over access to parking and conditions of provision will be incorporated into the EoI particularly for Stage 2. No change
Signage and lighting for existing parking could be improved. This is included in the Options report as an important consideration to amenity of the centre. No change
A review of the Car Parking Code is overdue. This is acknowledged and has been incorporated into a recommendation of this report. No change. A recommendation is provided in this report for the Council to consider allocation of resources to undertake a city wide parking strategy including Springwood Town Centre.

10. Sale of public land

Opposed to loss of community asset: not justified for the improvement of community facilities The sentiments are acknowledged. Sale is one of 3 different options available as part of the proposed EoI process and proponents will be asked to outline the benefits to the Council and the community associated with their proposal. No change

11. Lease of public land

Lease land rather than sell The sentiments are acknowledged. Lease is one of the options available as part of the EoI process and proponents will be asked to outline the benefits to the Council and the community associated with their proposal No change

12. Public Private Partnership (PPP)

Reference to failures of PPP development projects across the state; and the need to stop until results of government investigations have been released The sentiments are acknowledged. PPP guidelines are provided by the NSW Government. PPP offers the potential advantages of continued asset ownership while providing resources for public benefit such as community facilities. Proponents will be asked to outline the benefits to the Council and the community associated with their proposal No change.

13. Amenity/ Urban design of public streetscape

A number of submissions made suggestions to improve the amenity of the town centre through urban design measures These suggestions will be referred to relevant sections of the Council. Major town centre works were completed in 1996 with reasonable success. No change
Large commercial development will destroy the village character and street appeal Urban design is an important consideration for stage 2 of the EoI in particular. The precinct controls within LEP 2005 control design and scale of building. No change

14. Sustainable Design/ Environmental Conservation

Need energy efficient design EoI requires use of energy sustainable design principles No change
Do not increase stormwater impacts from Southern car park site on Magdala Creek catchment EoI requires water sensitive urban design and energy sustainable design principles in new development and refurbishment of community facilities. As each site has impervious cover already development it is possible that new development would reduce stormwater impacts. No change
Install rain tanks around the Library so that gardens can be established and maintained to beautify the area EoI requires use of water sensitive urban design and energy sustainable design principles in new development and refurbishment of public facilities. No change

15. Introduction of a Major Chain/Multi-national Supermarket/Shopping Centre

Will increase traffic congestion. See traffic section. No change
Will result in increased vandalism and graffiti. This is an existing problem that requires solutions generated outside of this project. The EoI can require that new development can be designed to minimise the potential for this to be a problem. Include reference to new development use safer by design principles and seek to reduce potential for graffiti and vandalism.
Will have negative impact upon local/established traders. It is likely that any new development would have both positive and negative impacts upon existing traders. The short term and long term

implications need to be considered by the Council. The EoI does provide the opportunity for the growth of existing shops including existing supermarkets.

No change.
Profits will go overseas. This is not an issue for the Council to determine. The EoI would require financial information on the capacity of the proponent and the benefits provided to both the Council and the community. No change.
Local traders support local community groups. Many larger chains as well as local traders have community support programs. Proponents will need to outline benefits to the Council and the community from their proposals. No change
There is no need for additional retailing. Shops are available at Winmalee and Penrith. A concern raised by some Springwood traders relates to recent loss of customers to Winmalee and elsewhere. HillPDA has advised that the Springwood market has the potential to support additional supermarket floor space of 2050m2. No change
Supermarkets are not in keeping with a World Heritage Area and the slow food movement. The World Heritage Listing applies to areas of National Park and not any urban area. Supermarkets already exist in the Blue Mountains LGA and are a permissible land use within the project area. No change
Design concerns related to common development form of large supermarkets. LEP 2005 governs the design of all new town centre development and sufficiently controls this issue. No change.
Large scale development. LEP 2005 provides controls over the scale and appearance of development including the height; street frontage; built form and finish; site coverage; setback; pedestrian safety and parking and vehicle access. No change
A new supermarket will bring more customers, modernise the area and provide better choice. The Project vision and outcomes seek to realise increased economic activity for Springwood. No change
Would prefer expansion of the existing supermarkets. The opportunity exists for this to be included in a proposal for the EoI should the owners or operators of the existing supermarkets wish to expand. No change

16. Retail/Commercial/ Residential Development

High rents are the cause of shop vacancies. The Economic Report prepared for the Council by HillPDA notes this comment from a local real estate agent and their initial investigations do support this observation. This project seeks to improve the economic viability of the Town centre. No change
Land uses such as offices and/ or

residential above shops should be
encouraged

LEP 2005 does permit a mix of uses to be developed within the town centre and the Options Report and EoI support this No change
Provide additional office space LEP 2005 does permit a mix of uses to be developed within the town centre and the Options Report and EoI support this No change
Provide Shops fronting Macquarie Road LEP 2005 supports this No change

17. Residential development

Shop top housing could be converted to office without the requisite parking being provided This is an enforcement issue which is outside of the scope of this project. No change

18. Retention of views to bushland

Council must retain views from Macquarie Road and the Town Square This can be a formal requirement on the redevelopment of the Southern carpark That retention of views of the bushland from the Town Square and Macquarie Road is part of the EoI requirements and any subsequent property negotiations of views of the bushland from the Town Square and Macquarie Road is part of the EoI requirements and any subsequent property negotiations
We need to retain views (from our property) as this was part of our understanding during the process involving dedication of the land to the Council for car parking. The Council will need to consider this situation. Investigate requirements and proceed to ensure any substantiated requirements are indicated on documentation and any subsequent property negotiations.

19. Retention of Parks and open space

Retain or enlarge the Town Square The Options Report suggests this happen. No change
An important element of the village

atmosphere is the open space within the town centre

The Option Report proposed relocation of the Early Childhood Centre to Buckland Park. This would reduce open space available. Remove reference to the relocation of Buckland

Park from the EoI
documentation

The use of native plants within the parks is important Although an important consideration the planting policy for parks is outside of the scope of the project. No change

20. Protection of capacity of Buckland Park to accommodate services at the War Memorial.

The relocation of the Early Childhood Centre to Buckland Park would threaten the capacity of the park to accommodate regular Memorial ceremonies The proposal for relocation of the ECC and playground to Buckland Park is not integral to the EoI as other opportunities exist for relocation of the ECC within new development of the northern car park, Southern Car park, or Civic Centre site Remove reference to the relocation of ECC to Buckland Park from the EoI documentation.

21. Relocation of the early Childhood centre and or the Children's Playground

Oppose relocation of Early Childhood Centre and Children's Play ground from town centre This proposal is not integral to the EoI as other opportunities exist for relocation of the ECC within new development of the northern car park, Southern Car park, or Civic Centre site Remove reference to the relocation of Buckland

Park from the EoI
documentation.

22. Public amenities/ toilets

There is a need for continued provision of public toilets in the central area of town. The toilets need to be highly visible and offer security for use. The need for security and visibility of public toilets can be a requirement in any redevelopment proposal. That the EoI includes as an outcome for the Northern or Southern car park of provision of visible and secure public toilet in the central section of the town centre

23. [Missing]

24. Community facilities are inadequate and need upgrading

A study is needed to indicate what is required to meet future population needs.

Engage a consultant to examine the

feasibility of upgrading the existing facilities in the Springwood Civic Centre and neighbourhood Centre.....

An initial report on community facilities and services informed the Options Report. However this is not sufficient to provide details of future requirements for community facilities and

services. It is proposed to undertake a Comprehensive Social and Cultural Assessment by March 2008. This report would then inform

No change to Stage 1 EoI. That a comprehensive social and cultural assessment report is undertaken by March 2008 to inform Stage 2 of the EoI.
Investigate energy efficient methods to upgrade the Civic centre stage 2 of the EoI process.  
A developer is unlikely to wish to pay for adequate provision of new community facilities The EoI proposes to test the capacity of the market No change
Different suggestions were offered as to how to relocate or provide new facilities e.g. move the Library and Early Childhood Centre to the Southern Car Park in conjunction with tiered car parking; detailed proposal for a
Performing Arts Centre
As part of the documentation of this Council report the suggestions can be made available for consideration by proponents of the EoI The content of the

submissions is available in support of this Council report and can be made available to support the EoI

Refurbishment of existing facilities is all that is required Either refurbishment or replacement of the community facilities within the study area would be a major cost for the Council. That is one of the reasons for commencing this project. No change
Fund maintenance and refurbishment or replacement of community facilities by means other than sale or lease of public land As the annual rates income of the Council is not increasing in line with the commitments for asset maintenance and replacement the Council has identified a need for pursuit of additional funding sources. The Council already actively pursues funding through Federal and State government sources. This project investigates a potential alternative funding source and the benefits will be assessed within the EoI process. No change

25. Existing access over public land from adjoining properties: this relates to all 3 sites

A number of existing developments currently require access over public land for a number of reasons such as parking, loading dock access or emergency exit; or retention of views to bushland. Retention of this access is proposed where

supported by relevant development approvals or other legal agreements recognised by the Council and/ or Crown

Provide details of easements with the EoI as survey documentation for consideration within proposals.

26. Increase tourism in the town centre

Improve promotion and signage from the Highway In order increase tourism there is a need to develop attractions. The existing Highway signage to the town centre meets RTA standards however for the RTA to permit specific tourism signage this requires tourism attractions to meet a number of base line criteria such as opening hours; and level of attractions. No change
Suggestions were made for development of a range of tourism attractions to revitalise the centre such as overflow exhibition space for the Art Gallery of NSW, Australian Museum or other

organisation willing to participate; Performing Arts Centre; reference facility for ex- Prime Ministers papers; promote assets like the Railway Station and Library; etc

Where permitted by planning policy opportunities are possible for any of these proposals within the EoI. They are however unlikely to be economically sustainable by the private sector and may need consideration through the proposed social and cultural assessment. No change
Increase opening hours of food outlets This is a matter for business operators not the Council No change

27. Bridge linking Northern car park to train station

This may be desirable however it would be expensive and unlikely to happen. This is acknowledged however mention within the EoI would indicate the potential to proponents who may consider it beneficial to their proposal. No change

28. Construction of tunnel from Northern to Southern car park

This may be desirable however it would be expensive and unlikely to happen. This is acknowledged however mention within the EoI would indicate the potential to proponents who may consider it beneficial to their proposal. No change

29. Heritage

Protect Braemar.....

Protect other items and streetscape/precinct elements.

Protect the Civic Centre as it is an important example of 1960s development.

This has been incorporated into the Options Report in accordance with the current and draft heritage listings in Springwood (LEP 2005). Legislation is in place to conserve the heritage listed items. No change necessary.

30. Include other Council land in Options Report and EoI

Why haven't other Council owned sites also been included in the Options Report?
There is a large parcel of operational land which includes Greenway Lane that runs from the Telstra owned land to the edge of Buckland Park which would lend itself to double storey development with the Greenway Lane and existing car parking facilities integrated into the development. This would encourage integration of existing retail outlets and arcades. It would allow for a double storey development that would not impinge on the aesthetics of Macquarie Road. A development on this site would be less disruptive to retailers. It would clean up what is an unsightly view from the Great Western Highway.

The proposed site is smaller and narrower than the other 3 sites.

Some of the land appears to be classified as community land. Greenway Lane access is to be maintained.

Development of this site would present difficulties associated with integration with existing adjoining development. Whilst connection to the two existing arcades would be desirable, this would require building alterations to both these in order for good connections to be made. There are a number of requirements under the Building Code of Australia that would need to be satisfied including egress from buildings, fire separation at the boundaries, light and ventilation amongst others.

Many of the other existing shops (such as Curves) have on site parking at their rear. This would need to be maintained as it is on private land.

Extensions could be built over the top of this private parking however additional on site parking would also need to be provided and there is little opportunity for this to occur. All existing entrance points for vehicles and pedestrians would need to be maintained or alternatives negotiated.

If existing shops were to extend towards a new development most would still need to be separate entities unless they could negotiate cross boundary entrances and possible modifications to internal floor plans of the new rear development.

This current project offers an opportunity to test the market for this site. An objective of the project is to increase the economic viability of the town centre and this site has potential to provide various benefits including an improvement to the views from the Highway and improving existing dead end arcades.

However additional property investigations would be required before this land could be included in the EoI so that four (4) sites are offered to the market generally in accordance with Option 2.

Adequate property investigations would not be able to be conducted within the current timetable for the project, and additional time would be required should the Council wish to include the additional site in the EoI.

No change

31. The classification of public land is questioned

Braemar should be classified community land The current classification is as operational land however the Council could reconsider this classification. No change to the EoI. The Council may wish to reconsider the classification of the land parcel separate to this project.
The land within the Southern Car Park should be classified community land The classifications contained within the Options Report have been checked and are considered to be valid. No change

32. Other matters

Include adjoining privately owned parcel of land in the Project This request is not within the scope of the project, and the suggestions is not consistent with the zoning of the land. No change

Sustainability Assessment

The Call for Expressions of Interest process will ask each proponent to detail how their proposal would address triple bottom line considerations.

Financial implications for the Council

This report represents one step within the overall Springwood Town Centre Project which seeks to provide a catalyst to assist revitalisation of the town centre. The Council has approved a budget allocation of $160,000 over 2006-2008 to undertake the Springwood Town Centre Project.

Legal and risk management issues for the Council

This report presents results and analysis of submissions presented to the Council on the Options Report. There are no legal requirements for the Council to undertake public consultation in this project; however the Council has decided to seek community comment at this critical stage of the project.

The Call for Expressions of Interest will be based around the planning framework and the preferred option as outlined in the Options Report. This report recommends amendments to the suggested opportunities for redevelopment of the three sites in response to the submissions. These will provide opportunities and suggestions for consideration by proponents for the EoI.

The Call for Expressions of Interest process is proposed to follow the Council's tendering policy.

Conclusion

This report recommends that the Council receive and note the submissions made on the Springwood Town Centre Options Report as publicly exhibited over the period 13 August to 22 September 2007.

It is recommended that the Council receive a report presenting the documentation and process proposed to be followed for the Call for Expressions of Interest (EoI) on three specified Council owned or managed sites within Springwood Town Centre being the Northern Car Park, the Southern Car Park and the Civic Centre Site.

It is recommended that the opportunities and suggestions for consideration in proposals are amended in response to the submissions received and are included in the documentation for the EoI to inform and guide proposals.

Criteria are proposed to guide the assessment of proposals lodged in Stage 1 of the EoI. These recognise the issues raised by the public submissions. The criteria for assessment are to include where practical but are not to be limited to:

  1. Relevant previous experience;
  2. Financial capacity;
  3. Conformance with LEP 2005;
  4. Net community benefit of Initial Proposal;
  5. Adherence to triple bottom line considerations.

The report also recommends that consideration is given in the preparation of the 4 year Management Plan 2008-2012 for resources to undertake a review of relevant strategic plans and policies including: Springwood Town Centre Master Plan; Springwood Town Centre Parking requirements; and preparation of a city wide parking strategy.

Attachment: Springwood Town Centre Project -
Public Submission Summary

(displayed in the order of number of comments in submissions)

  Overall Summary Springwood Town Centre The Civic Centre Site Northern Car Park Southern Car Park TOTAL
Support Opposed General
Comments

Total

Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
15: Introduction of a Major Chain/Multi-national Supermarket/Shopping Centre 6 114 10 130 2 93 9 1 14   2 4   1 3 1 130
2,3,4,24: Option Report Concept Plans: Civic Centre; Northern Car Park; Southern Car Park 24 82 16 122   6 1 6 33 6 10 20   8 22 9 121
8: Traffic     36 36     29     2     1     4 36
6,12: Expressions of Interest Process 2 27 6 35 2 24 6   3               35
23: Refurbish Community Facilities rather than build new facilities 32   2 34       32   2             34
10: Sale of Council Owned Land   31   31   21     6     1     3   31
9: Improve/ Increase Parking Supply 13 2 15 30 3   8 2   3 3   2 5 2 2 30
20, 21: Relocation of Early Childhood Centre 2 21 1 24       2 16     5 1       24
18: Retain View 19     19 1     2           17     20
23: Replace Community Facilities 4 14   18       4 14               18
1, 7: Planning Process   7 10 17   6 10   1               17
23: Generate Funds through State and Federal Sources 15     15       15                 15
14: Encourage Energy/ Water Conservative Design 13     13 5     8                 13
26: Increase Tourism 2   11 13 2   10                 1 13
5: Process: Consultation and Opportunity for Public Comment   10 3 13   5 3   1     3     1   13
  Overall Summary Springwood Town Centre The Civic Centre Site Northern Car Park Southern Car Park TOTAL
Support Opposed General
Comments

Total

Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
19: Open Space/ Parks     12 12     10     2             12
11: Lease the Land 7 4   11 5 2   1 2         1     11
2: Speed of the Project   11   11   10     1               11
9: Provide Underground Parking 7 3   10   3   3     2     2     10
16: Retail Business     10 10     9           1       10
19: Increase Size of the Town Square 8 1   9                   8 1   9
9: Multi-level parking (Decked) 4 4   8   4   1     1     2     8
15: Expand or Replace Existing Supermarket 6     6 1     1     4           6
28: Bridge Linking Car Park to Station 4 2   6             4 2         6
15: Safety/ Security     6 6     3     3             6
15: More Retail Development 2 1 3 6   1 3 1           1     6
28: Construct Tunnel between Northern and Southern Car Park 2 4   6   1           1   2 2   6
17, 26:Encourage Mixed Use Development 5 1   6 4 1               1     6
29: Heritage     6 6     1     4           1 6
26: Provide Shops Fronting Macquarie Road 3 2   5       1     2 2         5
  Overall Summary Springwood Town Centre The Civic Centre Site Northern Car Park Southern Car Park TOTAL
Support Opposed General
Comments

Total

Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
22: Public Amenities/ Toilet facilities 1 1 3 5   1 3       1           5
31: Reclassify Council

Owned Land to 'Community Land'

4     4 1     3                 4
13: Urban Design     4 4     4                   4
17, 26: Multi-Storey Residential Development on Part of the Site 2 1   3       2 1               3
15: Large Commercial Development on Site 1 2   3       1 2               3
14: Environmental Conservation 2   1 3     1 1     1           3
6: Timing and Length of the EOI Period   3   3   3                     3
25: Improve Tourism Signage on Highway 2 1   3 2 1                     3
5: Use same developer as one of the other sites 2     2       2                 2
23: Improve Performing Arts Hall 2     2       2                 2
27: Provide Additional Office Space 2     2             1     1     2
13: Improve Amenity     2 2     2                   2
25: Promote Town Centre     2 2     2                   2
32: Include with Redevelopment of adjoining private property 1     1       1                 1
  1. Utilise Other Council Owned Sites
1     1 1                       1
  1. Status of Council Owned Land
  1   1   1                     1
  Overall Summary Springwood Town Centre The Civic Centre Site Northern Car Park Southern Car Park TOTAL
Support Opposed General
Comments

Total

Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
Support Opposed General
Comments
Total 200 350 159 709 29 183 114 92 94 22 31 38 5 49 34 18 709